Flashing is an important line of defense in controlling moisture in wall assemblies.
Cedar shingle roof installation guide.
Return to all blogs.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
Cover the roof with roofing felt.
Cedar shingle application cedar shake application.
To ensure you are reading the latest edition of the roof manual please contact our office.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.
A guide to installing cedar shingles.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Joints in any one course should have a side lap of no less than 38mm from the joint in adjacent courses and in any 3 courses no 2 joints should align.
Looking for a dealer in your area.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Check the felt paper.
Nail a shingle at the end of each wall with the proper overhang and snap a chalk line to serve as a guide for the row.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
Flashing intercepts and directs the flow of water away from the building to designed drainage paths.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
How to install a cedar shingle roof on a garden shed step 1.
The shingles shall be spaced 6mm apart and be nailed or stapled twice the nails staples should be fixed 19mm in from the edge and 38mm above the butt of the course above.
Shake shingle roof application instructions feb 10 2017.
Click on the below links to view the full application instructions for.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
Using this chalk line method extend the first row around the entire shed.
Secure it to the.